← My projects
Submit a new project for SHPO review
Section 106 / ARS 41-861 review. 30-day statutory clock begins when SHPO marks the submission complete.
Placeholder· demo flow; no data persistedStep 1
Project info
Name, agency, funding, action type, and undertaking description.
Step 2
Area of Potential Effects
Draw a polygon on the map, upload a shapefile, or upload a KML/KMZ. We auto-identify overlapping NRHP / inventoried properties.
Step 3
Upload reports
Pedestrian survey, archaeological report, architectural eval, etc. PDFs with text layers are preferred.
Step 4
Submit
Receive confirmation number; track progress in My projects; receive reviewer correspondence and final determination by e-mail + e-sign.
Step 2 · Drop your APE center; we'll auto-identify
Live · runs against real NRHP, BLM SMA, FEMA NFHL, tribal nations, ADOT routes
Click anywhere in Arizona
We'll buffer your point and intersect against every layer SHPO owns.
Center point
Click the map to drop a point.
APE buffer radius
0.5 km
Or upload a shapefile / KMZ to use an exact polygon (production).
In production, SHOPP runs PostGIS
ST_Intersects against an exact shapefile-uploaded polygon. The buffer above is a quick demo of the same workflow — the resulting NRHP matches and consultation triggers pre-populate Step 3 and appear on the reviewer's screen alongside prior eligibility determinations.