4d leftPRJ-2026003Synthetic
Campground reconstruction — Maricopa Co. Supplemental
Submitted by FHWA via ADOT · Received 3/30/2026 · Deadline 4/29/2026
AI copilot — report summary (demo)
This campground reconstruction submitted by FHWA via ADOT in Maricopa County is a routine undertaking under Section 106 / 36 CFR 800. Auto-matched against the NRHP inventory: 2 listed or potentially-eligible properties fall within or near the project APE. The submitter has provided a pedestrian survey report with photographic documentation.
Draft determination language (Criterion A–D · NHPA §300308): Based on the identified APE, the undertaking will have no adverse effect on historic properties provided the conditions in Section 4 of the submitted report are followed.
Intersecting historic properties
Real data· NRHP matchesAT & SF Locomotive
NRIS 86001113
Kingman Army Air Forces Flexible Gunnery School Radio Tower
NRIS 99000107
Correspondence log (3)
Incoming4/23/2026
Response to RFI
FHWA via ADOT → SHPO — R. Alvarez
Outgoing4/16/2026
Request for additional information
SHPO — R. Alvarez → FHWA via ADOT
Incoming3/16/2026
Submittal: report for review
FHWA via ADOT → SHPO — R. Alvarez
Documents (3)
Synthetic3 reports + supporting exhibits. Click to preview (stubbed).
Project metadata
StatusReceived
TypeCampground reconstruction
Submitter kindfederal
CountyMaricopa
ReviewerR. Alvarez
Program areaR&C — Transportation
Actions