Dear contact96@example.gov:
The Arizona State Historic Preservation Office (SHPO) has reviewed your transmission line upgrade submission for the above-referenced undertaking pursuant to Section 106 of the National Historic Preservation Act and its implementing regulations at 36 CFR Part 800.
Project description. SYNTHETIC demonstration record. Transmission line upgrade submitted by BIA — Navajo Region.
Area of Potential Effects (APE). The APE includes a polygon of approximately 102.18 km² centered at 34.2600°, -111.2802° in Pinal County, Arizona.
Federal nexus. The APE intersects the following surface management jurisdictions: Private Land (Private); Tonto N.F (USFS); Yavapai Tonto Apache Res. (Indian Lands).
Tribal consultation. The APE intersects sovereign tribal land(s): Tonto Apache Tribe Off-Reservation Trust Land. Concurrent consultation with the appropriate Tribal Historic Preservation Officer(s) is required under 36 CFR 800.2(c)(2)(ii).
Flood hazard. The APE intersects FEMA flood zone(s) X, D.
Identified historic properties. No NRHP-listed properties were identified within the APE based on the submitted documentation and our current geospatial data.
ADOT historic / scenic route(s). Picacho to Cooliddge to Chandler to Mesa to Payson to Winslow.
Determination. Based on the foregoing, SHPO concurs with a finding of NO ADVERSE EFFECT pursuant to 36 CFR 800.5.
This determination is non-final until concurrence is received from all consulting parties. Should the scope of the undertaking change, please resubmit for re-review per 36 CFR 800.13.
Sincerely,