Dear contact190@example.gov:
The Arizona State Historic Preservation Office (SHPO) has reviewed your prescribed burn submission for the above-referenced undertaking pursuant to Section 106 of the National Historic Preservation Act and its implementing regulations at 36 CFR Part 800.
Project description. SYNTHETIC demonstration record. Prescribed burn submitted by Bureau of Reclamation.
Area of Potential Effects (APE). The APE includes a polygon of approximately 103.29 km² centered at 33.3296°, -110.8814° in Maricopa County, Arizona.
Federal nexus. The APE intersects the following surface management jurisdictions: Private Land (Private); Bureau of Land Mgmt. (BLM); Tonto N.F (USFS).
Flood hazard. The APE intersects FEMA flood zone(s) D.
Identified historic properties. The following NRHP-listed or eligible properties lie within or adjacent to the APE:
- Miami Avenue Bridge (NRIS 88001693) — 6.54 km from APE centroid.
- Bullion Plaza School (NRIS 00001591) — 7.17 km from APE centroid.
- Reppy Avenue Bridge (NRIS 88001689) — 7.28 km from APE centroid.
- Cordova Avenue Bridge (NRIS 88001690) — 7.35 km from APE centroid.
- Inspiration Avenue Bridge (NRIS 88001691) — 7.41 km from APE centroid.
- Keystone Avenue Bridge (NRIS 88001692) — 7.47 km from APE centroid.
- Our Lady of the Blessed Sacrament Church (NRIS 07001332) — 7.54 km from APE centroid.
- Soderman Building (NRIS 00000465) — 7.76 km from APE centroid.
- Miami Community Church (NRIS 05000137) — 7.88 km from APE centroid.
ADOT historic / scenic route(s). Quartzsite to Wickenburg to Phoenix to Globe to Show Low to Springerville; Tucson to Oracle Junction to Globe Highway and Show Low to Holbrook; Winkelman to Superior; Gila-Pinal Scenic Road.
Determination. Based on the foregoing, SHPO concurs with a finding of ADVERSE EFFECT, with stipulations pursuant to 36 CFR 800.5. Stipulations to protect contributing resources during construction shall be incorporated into the project design and monitored by a qualified historic preservation specialist.
This determination is non-final until concurrence is received from all consulting parties. Should the scope of the undertaking change, please resubmit for re-review per 36 CFR 800.13.
Sincerely,