21d leftPRJ-2026148Synthetic
Dam safety rehabilitation — Yuma Co. Phase II
Submitted by AZ State Land Dept · Received 5/23/2026 · Deadline 6/22/2026
AI copilot — report summary (demo)
This dam safety rehabilitation submitted by AZ State Land Dept in Yuma County is a routine undertaking under Section 106 / 36 CFR 800. Auto-matched against the NRHP inventory: 2 listed or potentially-eligible properties fall within or near the project APE. The submitter has provided a pedestrian survey report with photographic documentation.
Draft determination language (Criterion A–D · NHPA §300308): Based on the identified APE, the undertaking will have no adverse effect on historic properties provided the conditions in Section 4 of the submitted report are followed.
Intersecting historic properties
Real data· NRHP matchesPine Creek Bridge
NRIS 88001602
Alchesay Canyon Bridge
NRIS 88001615
Correspondence log (5)
Incoming5/27/2026
Submittal: report for review
AZ State Land Dept → SHPO — M. Tso
Outgoing5/19/2026
Request for additional information
SHPO — M. Tso → AZ State Land Dept
Incoming5/15/2026
Submittal: report for review
AZ State Land Dept → SHPO — M. Tso
Incoming5/6/2026
Response to RFI
AZ State Land Dept → SHPO — M. Tso
Outgoing4/30/2026
Concurrence with no adverse effect
SHPO — M. Tso → AZ State Land Dept
Documents (3)
Synthetic3 reports + supporting exhibits. Click to preview (stubbed).
Project metadata
StatusDetermined
TypeDam safety rehabilitation
Submitter kindstate
CountyYuma
ReviewerM. Tso
Program areaR&C — Energy/Wildfire
Actions